Tools
Framing and Piles
Quick take-off for framing grids, sheeting quantities and pile counts, laid out from the reference design but tuned to the rest of the Roots & Echo tool set.
Framing & Foundation
Quantities & Cost Estimate
Total Area:17.28 m2
Net Sheeting Area:17.28 m2
Sheets Needed:7
Members:16
Piles (est):15
Timber Cost:$297
Sheet Cost:$455
Piles Cost:$375
Total Estimated Cost:$1,127
Timber runout: 7 x 4.8 m + 9 x 3.6 m
Pile grid: 5 x 3
Balanced for a small cabin floor grid with bearer and joist take-off assumptions.
Typical H3.2 treated sheet allowance for exposed or semi-exposed floor use.
This is a fast estimating tool, not a structural design check. Final member sizes, spans, fixings, pile embedment, footing size and subfloor bracing still need to be confirmed against the actual project drawings, engineering requirements and current NZ code documents.